← Back to list

Cement-Trader Ship Details and Seafarer Feedback

IMO: 7716763

Cement Carrier, Antigua and Barbuda

Photos

Cement-Trader - Cement Carrier vessel registered in Antigua and Barbuda

Vessel Details

MMSI

304048000

Callsign

V2GQ4

Width

15.0 m

Length

106.0 m

Reviews (1)

Alan

2023-09-25

Position: Deck Officer

Advantages:

Looking for information about this vessel. Trying to find out more about this vessel? What was it like?

Disadvantages:

No personal experience yet, just gathering info.

Latest News (2)

Cement Trader Runs Aground Near Terneuzen: Successful Refloating Operation

May 13, 2025 13:04

On May 1, 2025, the bulk carrier 'Cement Trader' encountered a challenging situation as it ran aground while approaching the Western foreport of Terneuzen from Setubal. The vessel, which has a draft of 07.10 metres, became stranded between the Dow Schelde jetty and the foreport, triggering the need for immediate assistance. Emergency response came swiftly, with the tugs 'Multratug 16', 'Multratug 13', and 'VB Triumphante' arriving on the scene to facilitate the refloating operation, alongside the tug 'Patrol'. Thanks to their combined efforts, the 'Cement Trader' was successfully freed and subsequently moored at the Western foreport for a thorough inspection. After completing necessary checks, the ship departed Terneuzen on May 5, making its way back to Setubal, where it finally docked on May 9. For detailed reports and images from the incident, visit: https://www.tugspotters.com/app/content/2025/05/multratugs-trekken-vastgelopen-cement-trader-terug-vlot-na-stranding-op-westerschelde/

Cooling System Malfunction Affects Cement Trader's Voyage

Jan 18, 2020 21:24

On January 17, 2020, at 4:50 PM, the cement carrier 'Cement Trader' encountered significant issues with its main engine's cooling system while navigating from Bremerhaven to Setubal. The incident occurred at the coordinates 50° 03' 36.0'' N, 002° 43' 06.0'' W. After urgent repairs were executed, the vessel resumed its journey by 6:10 PM the same day. However, at 1:20 AM on January 18, the crew faced another challenge with the cooling pump in the main engine, prompting further repairs. The Maritime Rescue Coordination Centre (MRCC) maintained communication with the ship throughout the ordeal. Fortunately, by 2:20 AM, the crew successfully resolved the issue, allowing the Cement Trader to continue its voyage toward Augusta, with an estimated time of arrival set for January 25.

Frequently Asked Questions

🛠️ Did Cement-Trader experience any breakdowns or mechanical failures?

Based on available news reports, Cement-Trader has been mentioned in connection with breakdown-related incidents. There have been 1 news reports mentioning breakdowns. For detailed information about specific incidents, please refer to the latest news section above.

Breakdown Reported

⚙️ Did Cement-Trader have any engine problems?

Based on available news reports, Cement-Trader has been mentioned in connection with engine-related incidents. There have been 1 news reports mentioning engine problems. For detailed information about specific incidents, please refer to the latest news section above.

Engine Problem Reported

🧑‍🚒 Was Cement-Trader involved in any migrant rescue operations?

Based on available news reports, Cement-Trader has been mentioned in connection with migrant-related incidents. There have been 1 news reports mentioning migrant operations. For detailed information about specific incidents, please refer to the latest news section above.

Migrant Operation Reported

Add a Crew Review

Similar Vessels You Might Be Interested In

Aalborg-White

Aalborg-White

Cement Carrier

(1)
Adalynn

Adalynn

Crude Oil Tanker

(1)
Advantage

Advantage

Cement Carrier

(1)
Agaete

Agaete

Multi Purpose Carrier

(1)