Working Conditions Aboard the Earl-Thorfinn
IMO: 8902723
Passenger Ro Ro Cargo Ship, United Kingdom
Photos
Vessel Details
MMSI
232000760
Callsign
MLKP9
Width
11.0 m
Length
45.0 m
Reviews (1)
Eric
2023-10-08
Position: Second Engineer
Advantages:
Looking for information about this vessel. Any reviews on this vessel? How were the working conditions?
Disadvantages:
No personal experience yet, just gathering info.
Latest News (2)
Earl Thorfinn Faces Bow Thruster Breakdown, Repairs Underway in Kirkwall
The ferry 'Earl Thorfinn' docked at Kirkwall on September 15, 2018, at 2:00 PM for essential repairs following a mechanical setback. The vessel experienced a bow thruster malfunction on the afternoon of September 14. Efforts are underway to restore the ferry to its full operational capacity in the coming week. During this period, Orkney Ferries is actively working to accommodate all affected passengers, implementing combined sailings and adjusting departure and arrival schedules to minimize disruption.
Earl Thorfinn Set to Resume Normal Operations After Bow Visor Repairs
Orkney Ferries anticipates the prompt return of the 'Earl Thorfinn' to full service following a series of repairs addressing issues with its bow visor. The vessel has faced operational setbacks due to the malfunctioning bow visor, resulting in the inconvenient requirement for vehicles to reverse on and off the ferry. The bow visor encountered failures months ago, prompting an extensive investigation and the need for redesign and repairs to prevent future issues. During a significant refit in 2014, stronger hydraulic rams were installed on both vessels to enhance reliability. Additionally, modifications to the hydraulic control system have been initiated, with new components expected to be fitted within the next fortnight. A key aspect of this process has involved obtaining regulatory approval for the upgraded systems, which is anticipated to be granted imminently. Once the necessary certifications are obtained and the hydraulic systems are updated, the 'Earl Thorfinn' will resume its standard double-ended operations, streamlining transit for passengers and vehicles.
Frequently Asked Questions
🛠️ Did Earl-Thorfinn experience any breakdowns or mechanical failures?
Based on available news reports, Earl-Thorfinn has been mentioned in connection with breakdown-related incidents. There have been 2 news reports mentioning breakdowns. For detailed information about specific incidents, please refer to the latest news section above.
⚙️ Did Earl-Thorfinn have any engine problems?
Based on available news reports, Earl-Thorfinn has been mentioned in connection with engine-related incidents. There have been 2 news reports mentioning engine problems. For detailed information about specific incidents, please refer to the latest news section above.