Working Conditions Aboard the Glutra
IMO: 9208461
Passenger Ro Ro Cargo Ship, Norway
Photos
Vessel Details
MMSI
259638000
Callsign
LJZB
Width
16.0 m
Length
122.0 m
Reviews (1)
Nicholas
2024-09-09
Position: Engine Officer
Advantages:
Looking for information about this vessel. Trying to find out more about this vessel? What was it like?
Disadvantages:
No personal experience yet, just gathering info.
Latest News (3)
Glutra Ferry Caught at Flakk Dock Due to Power Failure
On the evening of November 8, 2018, the ferry "Glutra," which operates the Flakk - Rørvik route, became stranded at the ferry dock in Flakk due to a significant power outage. The power failure rendered the lifting bridge inoperable, preventing the vessel from departing. As a result, the ferry remained secured at the dock until power was restored. Passengers with vehicles onboard had to disembark and reverse their cars back onto the quay, highlighting the disruption caused by the unforeseen electrical issue.
Ferry Service Disrupted Due to Technical Issues on October 3, 2018
On October 3, 2018, the ferry operations between Flakk and Rørvik faced an unexpected halt as the 'GLutra' experienced technical difficulties. The 'Korsfjord', typically assigned to this route, was scheduled for refueling on the same day, which prompted the 'GLutra' to step in. However, this temporary replacement vessel encountered an electrical failure while docked in Trondheim, leading to delays in service. To address the issue, technicians were dispatched to diagnose the problem. Fortunately, by 2 p.m., the 'Korsfjord' was able to resume its regular route, reinstating service for passengers traveling between these two points.
Technical Issues Force 'Glutra' Ferry to Halt Operations
On November 25, 2015, the ferry 'Glutra' encountered technical difficulties and was temporarily taken out of service in Flakk. This unexpected situation left the 'Korsfjord' as the sole ferry available for the route between Flakk and Rørvik, operating only during the morning hours starting at 6 a.m. In response to the downtime, efforts were initiated to secure a replacement ferry. By midday, the 'Glutra' underwent trials following necessary repairs, marking a hopeful step towards restoring its operational capacity.
Frequently Asked Questions
🛠️ Did Glutra experience any breakdowns or mechanical failures?
Based on available news reports, Glutra has been mentioned in connection with breakdown-related incidents. There have been 2 news reports mentioning breakdowns. For detailed information about specific incidents, please refer to the latest news section above.
⚙️ Did Glutra have any engine problems?
Based on available news reports, Glutra has been mentioned in connection with engine-related incidents. There have been 2 news reports mentioning engine problems. For detailed information about specific incidents, please refer to the latest news section above.