Mv-Hjaltland Ship Details and Seafarer Feedback
IMO: 9244958
Passenger Ro Ro Cargo Ship, United Kingdom
Photos
Vessel Details
MMSI
235450000
Callsign
VSTY8
Width
20.0 m
Length
125.0 m
Reviews (1)
Jason
2025-05-16
Position: Third Officer
Advantages:
Looking for information about this vessel. Has anyone worked on this vessel? How was the atmosphere onboard?
Disadvantages:
No personal experience yet, just gathering info.
Latest News (5)
Specialist Repairs Underway for Ferry 'Hjaltland' in Aberdeen
A specialized team began inspections on the 'Hjaltland' ferry on April 15 in Aberdeen, addressing the issues with her bow doors that resulted in a delayed departure. Initially scheduled to leave Lerwick at 5:30 p.m. on April 10, the vessel faced a mechanical failure, causing her to set sail past 11 p.m. and arrive in Kirkwall at around 9 a.m. The repairs may require multiple visits, especially if any replacement parts are needed. Despite the potential for extended repair times, ferry operations will continue without interruption.
Hjaltland Ferry Experiences Delays Due to Bow Door Malfunction
The 'Hjaltland' ferry encountered significant delays, arriving at Kirkwall on April 11, 2026, at 8:30 a.m., nearly 10 hours late. Originally scheduled to depart from Lerwick at 5:30 p.m. for a journey to Kirkwall and Aberdeen, the ferry was held back until 11 p.m. due to a mechanical issue with its bow door. After the crew successfully addressed the technical difficulties, the vessel was cleared for departure. Once the necessary passenger and cargo operations were finalized in Aberdeen, the 'Hjaltland' set sail to continue its route.
Investigation Launched Following Flooding Incident at Rosyth Shipyard Impacting Hjaltland Ferry
On February 20, 2025, a significant flooding event in the pump room of the Rosyth Shipyard resulted in the Hjaltland ferry being rendered inoperable. This unexpected incident has spurred an inquiry into the circumstances surrounding the dry dock flood. In the aftermath, extensive repairs are underway, which include the dismantling and thorough testing of all pumps aboard the vessel. Additionally, critical components such as breakers, circuit boards, and control panels are being replaced, while cables are being removed and upgraded. A spokesperson noted, 'A very intensive set of works has been initiated following the dry dock incident,' but the timeline for the Hjaltland's return to operational status remains uncertain.
Emergency Airlift from Hjaltland Ferry Near Peterhead
On October 20, 2024, a dramatic rescue operation unfolded off the coast of Peterhead as a passenger aboard the ferry 'Hjaltland' required urgent medical attention. The situation arose in the evening when a passenger was suspected to have suffered a broken bone. Responding swiftly to the incident, a rescue helicopter was dispatched from Inverness to conduct the airlift. At the time, the 'Hjaltland' was on its voyage from Aberdeen, bound for Orkney and Shetland. This incident highlights the critical role of maritime emergency services in ensuring passenger safety on the high seas.
Important Update: Ferry Sailings Cancelled Due to Technical Issues
Ferry enthusiasts and travelers, please be advised that the sailing of the 'Hjaltland' set for February 18, 2024, from Aberdeen to Lerwick has been officially cancelled, along with the trip scheduled for February 19. Originally, the ferry was expected to depart Aberdeen for Kirkwall and Lerwick at 5 p.m. tomorrow. However, due to unforeseen technical reasons, the vessel will not be operating as planned. The 'Hjaltland' is now slated to resume service with a northbound departure from Aberdeen on the night of February 20. This ferry had recently undergone drydocking maintenance in Rosyth since February 3, aiming to ensure optimal performance upon return. Affected passengers have been notified and are encouraged to coordinate with Northlink Ferries to reschedule their travel plans for an alternate date.
Frequently Asked Questions
π Did Mv-Hjaltland sink or have any sinking incidents?
Based on available news reports, Mv-Hjaltland has been mentioned in connection with sinking-related incidents. There have been 1 news reports mentioning sinking incidents. For detailed information about specific incidents, please refer to the latest news section above.
π€ Were there any injuries or accidents on Mv-Hjaltland?
Based on available news reports, Mv-Hjaltland has been mentioned in connection with injury-related incidents. There have been 1 news reports mentioning injury incidents. For detailed information about specific incidents, please refer to the latest news section above.
π οΈ Did Mv-Hjaltland experience any breakdowns or mechanical failures?
Based on available news reports, Mv-Hjaltland has been mentioned in connection with breakdown-related incidents. There have been 3 news reports mentioning breakdowns. For detailed information about specific incidents, please refer to the latest news section above.
βοΈ Did Mv-Hjaltland have any engine problems?
Based on available news reports, Mv-Hjaltland has been mentioned in connection with engine-related incidents. There have been 4 news reports mentioning engine problems. For detailed information about specific incidents, please refer to the latest news section above.
π§βπ Was Mv-Hjaltland involved in any migrant rescue operations?
Based on available news reports, Mv-Hjaltland has been mentioned in connection with migrant-related incidents. There have been 1 news reports mentioning migrant operations. For detailed information about specific incidents, please refer to the latest news section above.