Pipe Layer, Russia

Photos

Akademik-Cherskiy - Pipe Layer vessel registered in Russia

Vessel Details

MMSI

273399760

Callsign

UDQB

Width

37.0 m

Length

150.0 m

Reviews (1)

Andrew

2024-02-12

Position: Second Officer

Advantages:

Looking for information about this vessel. Any reviews on this vessel? How were the working conditions?

Disadvantages:

No personal experience yet, just gathering info.

Featured Review Articles

Vessel Analysis Jun 18, 2026

Navigating Change: The Future of Akademik-Cherskiy Post Nord Stream 2

The Akademik-Cherskiy, a sophisticated pipe-laying vessel, has recently wrapped up its significant contributions to the Nord Stream 2 project, marking a pivotal moment in both its operational journey and the ongoing geopolitical dynamics surrounding...

Read Full Review

Latest News (3)

Akademik Cherskiy Arrives in Kiel for New Pipe Laying Missions Following Nord Stream 2 Work

Aug 29, 2021 13:38

The pipe layer vessel, Akademik Cherskiy, has successfully completed its operations on the controversial Nord Stream 2 gas pipeline near Rügen and has docked at HDW in Kiel on August 23, 2021. Following the final laying and welding of pipe segments, the Akademik Cherskiy made its way to Kiel, guided by tugboats, and arrived in the late afternoon. To prepare for its upcoming assignments, the ship must first dismantle several auxiliary components that were used during the pipeline installation. In the coming days, the crew will be busy removing these attachments, including a 30-meter-long drain ramp located at the stern. The vessel is poised to begin its next pipe-laying project as soon as these modifications are completed. For more detailed coverage and photos, check the German reports at https://www.kn-online.de/Kiel/Nordstream-Schiff-beendet-Arbeiten-und-steuert-Hafen-Kiel-an and https://forum-schiff.de/phpBB3/viewtopic.php?f=9&t=1377&start=10.

Completion Milestone Reached for Nord Stream 2 with Pipe Layer's Work Concluded

Jul 29, 2021 12:39

As of July 28, the Nord Stream 2 project, a key undersea gas pipeline connecting Russia to Germany, has reached an impressive 99% completion, according to the pipeline's operating authority. The completion of initial tasks was marked by the 'Akademik Cherskiy', a specialized pipe layer, which has now concluded its designated workload. This significant $11 billion venture aims to avoid transit through Ukraine, a geopolitical adversary of Russia, while simultaneously enhancing gas delivery capacity to 110 billion cubic metres annually, effectively doubling the existing Nord Stream pipeline's output. Meanwhile, the pipelay vessel 'Fortuna' continues its operations, diligently working on the final sections of the pipeline.

Akademik Cherskiy Starts Operations in German Waters for Nord Stream 2 Completion

Jul 19, 2021 19:34

On July 19, pipeline specialist Nord Stream 2 AG announced that the pipelaying vessel 'Akademik Cherskiy' is set to commence operations within German territorial waters, advancing the construction of the Nord Stream 2 gas pipeline network. A crucial notification was issued to mariners by the German Waterway and Shipping Authority on July 18, indicating that the Akademik Cherskiy will be laying a vital 2.6-kilometer segment of the pipeline in the German Exclusive Economic Zone. To ensure safety, all vessels are advised to maintain a distance of 2.3 nautical kilometers from the Akademik Cherskiy, although support vessels are exempt from this restriction. Additionally, fishing and anchoring activities in the vicinity of the pipelaying vessel are strictly forbidden. The Nord Stream 2 pipeline is particularly significant for Germany, as it is designed to transport an impressive 55 billion cubic meters of Russian natural gas annually to Europe via the Baltic Sea upon reaching full operational capability. This update follows a recent strategic meeting between US President Joe Biden and German Chancellor Angela Merkel, highlighting the ongoing tensions surrounding the project, as the US has voiced concerns over its potential impact on European energy security. In contrast, Chancellor Merkel has emphasized her focus on the implications for Ukraine, which stands to lose gas transit revenues due to the introduction of Nord Stream 2. Earlier preparations included test operations wrapped up in June, with the first of the two pipeline strings—each capable of delivering 27.5 billion cubic meters per year—now ready to be filled with gas. The entire Nord Stream 2 network is anticipated to reach completion by August.

Frequently Asked Questions

🌊 Did Akademik-Cherskiy sink or have any sinking incidents?

Based on available news reports, Akademik-Cherskiy has been mentioned in connection with sinking-related incidents. There have been 1 news reports mentioning sinking incidents. For detailed information about specific incidents, please refer to the latest news section above.

Sinking Incident Reported

Add a Crew Review

Similar Vessels You Might Be Interested In

Abigail

Abigail

Service Ship

(1)
Abrau

Abrau

Oil Products Tanker

(1)
Adelaide

Adelaide

Fishing Vessel

(1)