Complete Maritime Profile & Reviews of Finlaggan
IMO: 9482902
Passenger Ro Ro Cargo Ship, United Kingdom
Photos
Vessel Details
MMSI
235083892
Callsign
2ECF2
Width
16.0 m
Length
89.0 m
Reviews (1)
William
2024-04-07
Position: Welder
Advantages:
Looking for information about this vessel. Does anyone have experience with this vessel? How was the atmosphere onboard?
Disadvantages:
No personal experience yet, just gathering info.
Featured Review Articles
The Troublesome Journey of the Finlaggan: A Series of Technical Setbacks
<p>The <a href='/ships/finlaggan-9482902'>Finlaggan</a>, a vital ferry servicing the Kennacraig-Islay route, has recently encountered a series of mechanical issues that have disrupted its operations. Most notably, on December 11, 2023, the vessel suf...
Read Full ReviewThe Ongoing Challenges of the <a href='/ships/finlaggan-9482902'>Finlaggan</a>: A Glimpse into Recent Operational Issues
The <a href='/ships/finlaggan-9482902'>Finlaggan</a>, a key ferry serving the route between Kennacraig and Islay, has faced a series of technical challenges that have impacted its operations in recent months. Most notably, on September 5, the ferry s...
Read Full ReviewTechnical Troubles Hazards for the Finlaggan: A Comprehensive Overview
<p>The <a href='/ships/finlaggan-9482902'>Finlaggan</a>, a prominent ferry servicing the Kennacraig-Islay route, has recently experienced a series of technical challenges that have resulted in service delays and operational disruptions. On July 6, th...
Read Full ReviewLatest News (14)
Technical Difficulties Delay Finlaggan Ferry Service on Kennacraig-Islay Route
The MV Finlaggan, operating the Kennacraig-Islay ferry route, experienced a technical malfunction that necessitated additional repairs. As a result, the originally scheduled departure at 01:00 p.m. from Kennacraig was postponed to 02:15 p.m. This delay triggered subsequent disruptions throughout the remainder of the dayโs schedule.
Technical Glitch Averted for Finlaggan's Scheduled Voyage
On January 28, 2026, while operating the Kennacraig-Islay route, the ferry 'Finlaggan' encountered a technical challenge with its starboard side mooring winch. Fortunately, after thorough assessment, the crew managed to resolve the issue in time to ensure the vessel could proceed with its planned 6:00 p.m. departure from Kennacraig, which had previously been in jeopardy of being canceled or delayed.
Generator Trouble Halts Finlaggan Ferry Service on Kennacraig-Islay Route
On January 18, 2026, the ferry 'Finlaggan', which operates on the Kennacraig-Islay route, faced a significant generator malfunction. As a result, the vessel was relocated to Kennacraig for contractor evaluation, leading to the cancellation of its afternoon sailing. In light of the ongoing investigations, both the 07:00 a.m. departure from Kennacraig and the 09:45 a.m. sailing from Port Ellen scheduled for January 19 were also called off. Thankfully, after the generator issue was successfully addressed, the 'Finlaggan' was able to reestablish its service with a 1:00 p.m. sailing from Kennacraig.
Delays Hit Ferry Service on Kennacraig-Port Askaig Route Due to Fuel Pump Malfunction
On December 31, the ferry 'Finlaggan', which operates between Kennacraig and Port Askaig, experienced a malfunction with its fuel pump. This technical setback led to a delay of the scheduled departure from Kennacraig at 1 p.m., pushing the departure time to 2:30 p.m. Consequently, the disruption affected the subsequent sailing from Port Askaig, originally set for 3:30 p.m. After prompt repair efforts were undertaken, the vessel commenced loading traffic to ensure a timely departure from Kennacraig.
Engine Troubles Halt Finlaggan Ferry Service on Kennacraig-Islay Route
On December 11, 2023, the ferry 'Finlaggan', which operates on the Kennacraig-Islay route, encountered a technical disruption due to an issue with its port side main engine. This unforeseen engine malfunction has led to the cancellation of two key sailings: the 1:00 p.m. departure from Kennacraig and the 3:30 p.m. departure from Port Askaig. Passengers are advised to stay updated, as the operator, CalMac, is expected to release further information regarding the 6:00 p.m. departure from Kennacraig around 3:00 p.m. If you're planning to travel, keep an eye out for updates to ensure a smooth journey.
Technical Glitch Delays 'Finlaggan' Ferry Service on Kennacraig-Islay Route
On November 24, the 'Finlaggan' ferry, which operates between Kennacraig and Islay, encountered a technical issue affecting its mezzanine deck. This malfunction resulted in a service delay of around 25 minutes, impacting passengers' travel plans. Efforts are underway to resolve the issue and ensure smooth service on this vital route.
Finlaggan Encounters Technical Setback Affecting Port Ellen Schedule
On November 16, the ferry 'Finlaggan', which operates between Port Askaig and Port Ellen, faced a technical issue with the Port FRC. As a result, the ferry's anticipated 10:00 a.m. departure from Port Ellen was put on hold, leading to potential delays for travelers. Authorities are assessing the situation to minimize disruption to the service.
Finlaggan Ferry Faces Stabilizer Challenges
The 'Finlaggan', which operates on the Kennacraig-Islay route, encountered a technical malfunction with its port side stabilizer, leading to its suspension of services on September 25. This mechanical issue imposed certain limitations concerning favorable weather and sea conditions for the vessel's safe operation. The ferry's operator, CalMac, promptly initiated investigations to explore repair options and crafted a plan to address the issue. Due to these ongoing repairs, the service may experience increased risks of disruption or cancellation, particularly during periods of adverse weather.
Generator Malfunction Disrupts Finlaggan Ferry Service on Islay Route
On September 5, the 'Finlaggan', which operates on the Kennacraig-Islay route, encountered a generator malfunction that affected its schedule. Departures from Kennacraig at 07:00 a.m., 01:00 p.m., and 06:00 p.m. faced potential disruptions. Additionally, sailings from Port Ellen at 09:45 a.m. and from Port Askaig at 03:30 p.m. were also at risk of cancellation. The situation impacted the following dayโs schedule, with the 06:00 p.m. departure from Kennacraig and 08:15 p.m. sailing from Port Askaig also under threat. After successful repairs and testing, the 'Finlaggan' was able to resume operations on September 7, starting with the 07:00 a.m. departure from Kennacraig.
Delays for Ferry 'Finlaggan' on Kennacraig-Islay Route Due to Lift Malfunction
On September 1, the ferry 'Finlaggan', which operates the Kennacraig-Islay route, experienced a lift malfunction that led to a delay in its schedule. The vessel was originally set to depart from Port Ellen at 09:45 a.m., but this was postponed due to the technical issue. A temporary repair was executed to address the lift concern while the crew conducted further inspections during the ferry's journey to Kennacraig. Ultimately, the 'Finlaggan' departed Port Ellen at 11:00 a.m. and was expected to arrive in Kennacraig at approximately 1:30 p.m.
Finlaggan Ferry Encounter Technical Glitch with Mezzanine Deck
On July 6, the 'Finlaggan', which operates on the Kennacraig-Islay route, experienced a malfunction with its mezzanine deck. This unforeseen technical issue caused a delay for the ferry's scheduled departure from Port Askaig at 6:00 p.m. Passengers were left waiting as the crew worked diligently to resolve the problem. Fortunately, the issue was fixed, allowing the ferry to finally set sail at 6:50 p.m., resulting in a 50-minute delay. The estimated time of arrival in Kennacraig was adjusted to 8:45 p.m., ensuring that travelers were kept informed of their journey's timeline.
Fast Rescue Craft Issue Delays 'Finlaggan' Ferry Operations
On June 29, 2025, the ferry 'Finlaggan', which operates on the Kennacraig - Islay route, encountered technical difficulties with its fast rescue craft. This unforeseen issue led to a delay in the scheduled departure time, originally set for 10:00 a.m. From Kennacraig, the ferry eventually set sail at 10:45 a.m., resulting in subsequent delays for the rest of the day's services. Passengers were advised to proceed with check-in as planned, ensuring minimal disruption to their travel plans.
Engine Problems and Mezzanine Deck Issues Cause Delays for 'Finlaggan' Ferry
On February 5, 2025, the 'Finlaggan', which operates the Kennacraig-Islay route, encountered significant problems with her starboard side main engine around midday. This mechanical failure led to delays for the scheduled sailing departing from Kennacraig at 1 p.m. and the subsequent journey from Port Askaig set for 3:30 p.m. Passengers were advised that these sailings might be canceled on short notice as repair work commenced. After addressing the engine concerns, the vessel was able to begin loading operations. The 3:30 p.m. departure from Port Askaig eventually got underway more than three hours later, at 6:45 p.m. Additionally, the ferry faced complications with its mezzanine deck, which further postponed its arrival back in Kennacraig on February 6. Despite the delays, passengers scheduled for the 1 p.m. sailing from Kennacraig were still instructed to check in as planned.
Delay and Route Change for Finlaggan Due to Bow Door Malfunction
On the evening of January 30, 2025, the ferry 'Finlaggan', which operates between Kennacraig and Islay, encountered a significant issue with its bow door that caused delays in its service. The vessel departed from Kennacraig at 7:20 p.m., lagging behind schedule by one hour and twenty minutes. It finally reached Port Askaig at 9:15 p.m. In light of the situation, the next sailing scheduled for January 31 at 07:00 a.m. from Kennacraig was also affected, pushing the departure time back to 08:00 a.m. and requiring a diversion to Port Askaig instead. This shift also impacted the 09:45 a.m. crossing from Port Ellen, which now left from Port Askaig to accommodate the changes.
Frequently Asked Questions
๐ ๏ธ Did Finlaggan experience any breakdowns or mechanical failures?
Based on available news reports, Finlaggan has been mentioned in connection with breakdown-related incidents. There have been 11 news reports mentioning breakdowns. For detailed information about specific incidents, please refer to the latest news section above.
โ๏ธ Did Finlaggan have any engine problems?
Based on available news reports, Finlaggan has been mentioned in connection with engine-related incidents. There have been 12 news reports mentioning engine problems. For detailed information about specific incidents, please refer to the latest news section above.
๐ฅ Was Finlaggan involved in any collisions?
Based on available news reports, Finlaggan has been mentioned in connection with collision-related incidents. There have been 1 news reports mentioning collisions. For detailed information about specific incidents, please refer to the latest news section above.
๐งโ๐ Was Finlaggan involved in any migrant rescue operations?
Based on available news reports, Finlaggan has been mentioned in connection with migrant-related incidents. There have been 1 news reports mentioning migrant operations. For detailed information about specific incidents, please refer to the latest news section above.
๐ Was Finlaggan detained or arrested?
Based on available news reports, Finlaggan has been mentioned in connection with detention-related incidents. There have been 1 news reports mentioning detentions. For detailed information about specific incidents, please refer to the latest news section above.