Balder Vessel Reviews and Specifications
IMO: 7710226
Crane Ship, Panama
Photos
Vessel Details
MMSI
354721000
Callsign
3EWK
Width
100.0 m
Length
154.0 m
Reviews (1)
Paul
2025-06-09
Position: Chief Engineer
Advantages:
Looking for information about this vessel. Any reviews on this vessel? How's the management?
Disadvantages:
No personal experience yet, just gathering info.
Latest News (2)
Urgent Medevac Operation Near Grand Isle: Coast Guard Aids Injured Worker
On October 2, 2023, the U.S. Coast Guard successfully conducted a medevac operation for a 50-year-old man aboard the crane vessel 'Balder,' located roughly 35 miles south of Grand Isle, Louisiana. The emergency response began when Coast Guard Sector New Orleans received a distress call at approximately 4:58 a.m. from the vessel’s operating manager, who reported that a crew member was suffering from chest pains. In response, watchstanders promptly dispatched a team from Coast Guard Air Station New Orleans, including an MH-60 Jayhawk helicopter crew. Upon arrival at the scene, the aircrew hoisted the man safely aboard the helicopter and transported him to the University Medical Center in New Orleans, where he was greeted by emergency medical services. He has since been reported in stable condition. For more details, view the report with video here: https://www.news.uscg.mil/Press-Releases/Article/3545004/coast-guard-medevacs-man-offshore-grand-isle-la/
Historic Subsea Contract Secured by Technip and Heerema for Kaombo Project
In a landmark decision, Total E&P Angola has greenlighted a $16 billion investment for the Kaombo project, leading to Technip and Heerema Marine Contractors securing the largest SURF (subsea, umbilical, riser, flowline) contract in history, valued at around USD $3.5 billion. This ambitious project will take place in Block 32, situated offshore Angola at impressive depths nearing 2,000 meters. Technip will handle approximately 55% of the work, while Heerema will take on 45%. To facilitate operations, Heerema is set to deploy the Deep Water Construction vessel, Balder, which will be responsible for the installation of all STTRs and the 18”/12” pipe-in-pipe production pipelines. Meanwhile, Technip's Deep Blue will take charge of the remaining pipeline installations. Additional support will be provided by Technip’s fleet for the installation of flexibles and umbilicals, ensuring a comprehensive approach to construction. The project is on track for completion in the first half of 2018.
Frequently Asked Questions
🌊 Did Balder sink or have any sinking incidents?
Based on available news reports, Balder has been mentioned in connection with sinking-related incidents. There have been 1 news reports mentioning sinking incidents. For detailed information about specific incidents, please refer to the latest news section above.
🤕 Were there any injuries or accidents on Balder?
Based on available news reports, Balder has been mentioned in connection with injury-related incidents. There have been 1 news reports mentioning injury incidents. For detailed information about specific incidents, please refer to the latest news section above.