Chorus-V Ship Details and Seafarer Feedback
IMO: 9261970
Bulk Carrier, Panama
Photos
Vessel Details
MMSI
352005594
Callsign
3E8831
Width
32.0 m
Length
189.0 m
Reviews (1)
Robert
2024-01-03
Position: Able Seaman
Advantages:
Looking for information about this vessel. Trying to find out more about this boat? Any red flags?
Disadvantages:
No personal experience yet, just gathering info.
Latest News (2)
Disabled Bulk Carrier 'Tamarack' Navigates Bosphorus for Repairs
The bulk carrier 'Tamarack' successfully received permission for transit through the Canakkale Strait, making its eastbound passage on March 9. Currently, it awaits the necessary transit passage approval from the Istanbul Strait authority, which will only be granted during daylight hours, under favorable weather conditions, and when currents are manageable. Additionally, the transit will require assistance from Coastal Safety tugs and supervision by a pilot. On March 12, the 'Tamarack' was towed by the 'RR Spinola' and 'Kurtarma 8' (IMO: 9598610), with the 'Kurtarma 5' (IMO: 9463164) providing support at the stern. The estimated time of arrival (ETA) at its destination, D'Bugskiy, has been pushed back to March 15. After undergoing significant challenges, the vessel entered a shipyard in Constantza on April 3 for permanent repairs, which were finalized by June 15. Following satisfactory performance tests completed under the watchful eyes of Class surveyors, the classification society and flag state authority issued a new set of trading certificates. After completing all required formalities, the vessel was granted clearance by the Harbour Master to depart. The 'Tamarack' then set sail for Novorossiysk, where it arrived on June 18.
Disabled Vessel 'Tamarack' Under Tow to D'Bugskiy After Engine Failure
On February 1, 2020, the cargo ship 'Tamarack' encountered a significant setback while navigating from Conakry to D'Bugskiy. The vessel suffered an engine failure off the coast of Malta, precisely at coordinates 35°59'08" N and 14°25'35" E. To address the situation, the tugboat 'RR Spinola', identified by its IMO number 9495258, was dispatched for assistance. Departing from Valletta on February 13, the 'RR Spinola' took the 'Tamarack' in tow, with the operation officially commencing the same day. The estimated time of arrival (ETA) for the tow to reach D'Bugskiy is set for February 24, 2020.
Frequently Asked Questions
🛠️ Did Chorus-V experience any breakdowns or mechanical failures?
Based on available news reports, Chorus-V has been mentioned in connection with breakdown-related incidents. There have been 2 news reports mentioning breakdowns. For detailed information about specific incidents, please refer to the latest news section above.
⚙️ Did Chorus-V have any engine problems?
Based on available news reports, Chorus-V has been mentioned in connection with engine-related incidents. There have been 2 news reports mentioning engine problems. For detailed information about specific incidents, please refer to the latest news section above.